Phyto-Fortress™

8' × 16' portable, monolithic hemp-geopolymer shelter kit

Design Package Rev 1.0 — Development Specifications

Overview

The Phyto-Fortress is the first building-scale demonstration of the Phyto-board® system: a timber skeleton carries the structural load, a reactive hemp-hurd geopolymer infill fills and locks the envelope together, and Phyto-board panels form the continuous interior and exterior skins. It ships as a shell — framed openings, skid base, and core envelope complete — with doors, glazing, HVAC, and interior fit-out left to the installer.

How it bonds

The reactive hemp-hurd geopolymer isn't a filler poured into a cavity — it's a chemical bonding system. The underlying chemistry class starts from five inputs: hemp hurd, crystalline silica, silanes, lime, and metakaolin.

StepReaction
1. Surface preparationHydroxyl (–OH) groups on hemp hurd and silanol (Si–OH) groups on silica become available for bonding
2. Silane couplingSilanes hydrolyze and bridge — one end bonds to hemp hurd, the other to silica
3. Lime activationLime dissolves, releasing Ca²⁺ and OH⁻, raising pH to activate silica and metakaolin surfaces
4. Pozzolanic reactionMetakaolin dissolves in the high-pH environment; Si and Al species react with Ca²⁺ to form C-S-H and C-A-H hydrates
5. Matrix formationHydrate gels grow and encapsulate the hemp hurd and silica, filling pores into a dense, low-porosity matrix

Phyto-board's production formulation extends this baseline chemistry with additional coupling agents and activation chemistry, produced under in-process quality assurance controls, to reliably yield the HD, MD, and LT density grades used across the panel and Phyto-Fortress product lines.

Kit specifications

Footprint
8 ft × 16 ft
Wall thickness
~10 in (target)
Floor thickness
~6 in (target)
Roof thickness
10–12 in (nominal)
Base
Timber skid, steel-runner reinforced
Wind resistance
100 mph (design intent)
Doors
1 (pre-cut, framed opening)
Windows
High-cut impact windows, all 4 walls

Panel and wall-thickness figures are development targets pending final engineering (structural, thermal, fire). Tolerances: panel thickness ±1/16 in, panel length/width ±1/4 in, out-of-plumb ±1/4 in per 10 ft. Wind/impact values are design intent until confirmed by testing.

Wall build-up (exterior → interior)

LayerMaterialFunction
1HD Phyto-board exterior panelHydrophobic, impact- and weather-resistant surface
2Offset 2×4 timber frameStructural load path, thermal break
3Reactive hemp-hurd geopolymer infillMonolithic structural/insulating core, bonds to lumber and skins
4Offset 2×4 timber frame (interior side)Structural load path, thermal break
5MD Phyto-board interior panelInterior structural finish surface

Offset framing on both faces leaves a continuous geopolymer core between them — this uninterrupted infill is what makes the wall act as one monolithic composite rather than a layered assembly.

Assembly diagrams & illustrations

Diagrams and illustration links will land here when provided.
(Wall section · skid base · corner molds · tier overlays)

Bill of materials

Structural members
ItemSpec
Timber / engineered wood framing2×4, offset dual-frame per wall/roof/floor stack
Skid base8' × 16' timber skid, 9043-coated steel runners
Corner lifting / tie-down hardwareIntegrated at skid corners
Phyto-board panels
ItemSpec
HD exterior panel4' × 8', 5/8", light orange dye, hydrophobic
MD interior panel4' × 8', 5/8", dark blue dye
Geopolymer materials
ItemSpec
Hemp hurdRegionally processed, packaged in 40 lb vacuum bags
Crystalline silica (SiO₂)Reactive filler / network strength
Silanes (organofunctional)Coupling agent — bridges hemp hurd and silica/alumina
Lime (Ca(OH)₂)pH activation, pozzolanic reaction
MetakaolinAluminosilicate binder component
Quikcrete or equivalentSourced locally at assembly site — not shipped
Connections & fasteners
ItemSpec
Structural connectorsConventional, per engineering spec
Hurricane strapsTop plate to roof structure (Intermediate/Tier One)
Reinforced anchor connectionsAt skid
Molds / forms
ItemSpec
Small radius corner moldR 1½" (38 mm), one-piece, reusable
Large radius corner moldR 6" (152 mm), split/reusable
Hardware, vapor barrier, and tools
ItemSpec
FastenersPer assembly guide
Vapor / weather componentsAs required by climate configuration
Tools & accessoriesMix, placement, and finishing tools (kit-supplied)
Doors / windows / glazingKit-supplied hardware; install by local labor
Documentation & packaging
ItemSpec
Assembly guideIncluded, sequence-numbered
Component packagingOrganized by assembly sequence and identification tags

Not shipped — sourced locally at the build site: water and Quikcrete (or equivalent) for geopolymer mixing, and local assembly labor.

Assembly sequence

  1. Set the skid foundation
    Position the 8' × 16' timber skid with steel runners on a level, drained base (concrete or naturally firm foundation). Confirm sill gasket / moisture barrier is in place.
  2. Erect the timber skeleton
    Assemble the offset 2×4 wall, roof, and floor framing per the numbered kit sequence. This frame carries the full structural load — panels and infill do not.
  3. Install Phyto-board panels
    Place HD exterior panels first, then MD interior panels, on the framed skeleton — leaving the continuous cavity between them for infill.
  4. Place and secure corner molds
    Fit the reusable radius-corner molds (small or large radius, per spec) at each vertical corner and transition before pouring infill.
  5. Mix and place geopolymer infill
    Mix hemp hurd, silica, silanes, lime, and metakaolin with locally sourced water per the kit's mix ratios. Place into the wall/roof/floor cavities and compact.
  6. Cure
    Allow the reactive infill to cure per the assembly guide's schedule before removing molds or loading the structure.
  7. Remove molds, finish corners
    Strip corner molds once cured. Corner is now complete and part of the continuous structural envelope.
  8. Install openings and utilities
    Fit doors, windows, and any specified vapor/weather components. Route service penetrations through sealed, compatible fittings.

Kit tiers

Basic

Economical timber-frame shell with Phyto-board envelope and simple skid connection.

Intermediate

Adds hemp scrim reinforcement, hurricane straps, stronger opening blocking, and reinforced anchor connections.

Tier One

Adds a protected internal steel storm core with reinforced opening frame, roof tie rail, diagonal tension strap, and steel-reinforced sill connection.

Specifications compiled from Phyto-Board design package materials (Rev 1.0, 14 Aug 2025) and the 8×16 Phyto-Fortress kit diagrams. Panel thickness shown at 5/8" for this pamphlet; final thickness and density are engineered per site conditions and load requirements. Wall/roof/floor totals marked "nominal" are subject to structural, thermal, fire, and code-compliance testing — confirm current values before publishing to a formal spec sheet or grant submission.